Varanasi-Howrah High Speed Rail: Project Information, Tenders, Stations, Routes and Updates
Naomi PandyaPosted on: 2021-02-04 08:04:00Viewer: 8,785Comments: 0 Country: India City: New Delhi
Project Summary
Project Name: Varanasi-Howrah High Speed Rail (Bullet Train) Project
Owner: Indian Railways
Operator: National High Speed Rail Corporation Limited
Project Type: High Speed Rail
Project Cost: NA
Route Length: 760 km
Train Speed: 320 kmph
Journey Fare: Rs 4.5 per km
Journey Hours: 2 hours 37 minutes
Status: Approved and under DPR stage
Varanasi-Howrah High-Speed Rail Route
Route Length: 760 km (At grade, elevated and underground)
Total Stations: 10
Station Names: Varanasi, Buxar, Arrah, Patna, Nawada, Dhanbad, Asansol, Durgapur, Burdaman and Howrah.
System Information
Train Type: Bullet Train
Operational Speed: 320 kmph
Maximum Speed: 350 kmph
Average Speed: 250 kmph
Track Gauge: Standard Gauge – 1435mm
No. of Cars: 10
Train Capacity: 750 person
Signalling: ETCS Level-2 of ERTMS
Traction: 25 KV AC through overhead catenary (OHE)
Train Safety: Urgent Earthquake Detection and Alarm System (UrEDAS)
Major Contractors
Highway Engineering - Magnitude Consortium: For Data Collection and Associated Survey Work for preparing the detailed project report (DPR).
Project Timelines
December 2019: Ministry of Railways had given the task to National High Speed Rail Corporation Limited (NHSRCL) for preparing the detailed project report (DPR).
February 2020: NHSRCL has started floating tenders for various activities including design and survey of the project.
If you find this story or article useful, please share to your social media network.
Naomi Pandya
Naomi is associated with Urban Transport News since its inception. She is working as a Corporate News Reporter.