New Delhi, India (Urban Transport News): After the launch of 7th Vande Bharat Express on Howrah - New Jalpaiguri Railway Route on 30th December 2022 by Prime Minister Narendra Modi, Indian Railways is all set to launch its 8th such train this month on Secunderabad-Visakhapatnam Railway route of South Central Railway (SCR).
The Vande Bharat express would cover the total distance of about 660-km from Visakhapatnam to Secunderabad in 8 hours as against the 12 to 14 hours of present express trains.
The Vande Bharat Express is a fully AC train, having 16 coaches with a capacity of around 1,128 seats. The new Vande Bharat trains can reach a speed of 0 to 100 kilometers per hour in just 52 seconds, with a top speed of up to 180 kmph. The version 2.0 trains weigh around 392 tonnes, 38 tonnes lighter than the previous versions.
The Vande Bharat Express trains (previously known as Train 18) have been introduced to upgrade maintenance technologies and methodologies and achieve improvement in productivity and performance of all Railway assets and manpower in which inter-alia would cover reliability, availability, utilization and efficiency.
These trains are equipped with world-class passenger amenities. It can achieve high speeds due to faster acceleration and deceleration and will reduce journey time by 25% to 45%.
In the union budget 2022, Finance Minister Nirmala Sitharaman announced that 400 new-generation Vande Bharat Express Trains with better energy efficiency will be developed and manufactured during the next three years.
The manufacturing of first prototype of 'Train 18' was completed in October 2018. It was planned to replace the then-existing 30-year-old Shatabdi Express, which takes 15% longer time to complete the same journey. Since it took 18 months to be manufactured, it was renamed to 'Train 18'.During test runs, the train achieved an operational speed of 180 kmph, making it the fastest train to ever run in India.
Train No | Terminals | Distance | Division | Inauguration |
1st (22435/22436) | New Delhi - Varanasi | 769 km | NR | 15 Feb, 2019 |
2nd (22439/22440) | New Delhi - Shri Mata Vaishno Devi Katra | 530 km | NR | 3 Oct, 2019 |
3rd (20901/20902) | Mumbai Central - Gandhinagar Capital | 520 km | WR | 30 Sep, 2022 |
4th (22448/22447) | New Delhi - Amb Andaura | 415 km | NR | 13 Oct, 2022 |
5th (20607/20608) | Chennai - Mysuru | 479 km | SR | 11 Nov, 2022 |
6th (20825/20826) | Bilaspur - Nagpur | 413 km | SECR | 11 Dec, 2022 |
7th (22301/22302) | Howrah - New Jalpaiguri | 561 km | ER | 30 Dec, 2022 |
8th (TBA) | Visakhapatnam - Secunderabad | 663 km | SCR | 19 Jan, 2023 |