Beyond the Tailpipe: The Case for African Electric Mass Transit
A Rejected Claim Is Not Always the End, What Car Owners Can Do Next?
Monsoon Bike Insurance Guide: Covers That Matter before the Rains Begin
How Train Transportation Creates Faster and Smarter Cities
PM Modi inaugurates Noida International Airport, Boosting North India’s Multi-Modal connectivity
Things You Can Do While on Long Train Rides: Stay Productive, Relaxed, and Entertained
Rail Chamber launches 2026–27 National Membership Drive to strengthen Asia’s Railway Ecosystem
North-South Commuter Railway (NSCR): Modern Train Network Connecting Luzon Island
India launched Bharat Taxi Service as First Cooperative-Owned Digital Mobility Platform
India places World’s First Live Commercial Order for Hyperloop-Based Cargo Logistics
Indore, India (Urban Transport News): The Madhya Pradesh Metro Rail Corporation Limited (MPMRCL) issued global tender notice for supply of 750VDC Third Rail and Electrical Systems for Indore Metro Rail Project.
Engineering, Supply, Erection, Testing and Commissioning of Power Supply Receiving Sub-Station, Traction Sub-Station, Auxiliary Sub-Station, 750 VDC 3rd Rail and SCADA System for Indore Metro Rail Project.
Tender documents can be downloaded from Govt's e-tendring portal from 10.11.2021 to 05.01.2022.
The 3rd Rail system is a means of providing electric traction power to trains, and the system uses an additional rail which is known as “conductor rail” for its work. The conductor rail is placed on the sleeper ends mostly located outside of the running rails. However, a central conductor rail is also used in some cases.
The first ring line corridor (Line 3) of Indore Metro will be 33.53 km long and it will connect Palasia to Airport with 30 metro stations.
For more details, please explote the Indore Metro page of Urban Transport News.