Bids invited for Signalling, Train Control and Telecom for Delhi-Meerut RRTS

Anushka Khare Posted on: 2020-05-04 07:14:33 Viewer: 644 Comments: 0 Country: India City: New Delhi

Bids invited for Signalling, Train Control and Telecom for Delhi-Meerut RRTS

New Delhi, India (Urban Transport News): National Capital Region Transport Corporation (NCRTC) invites international competitive bids from eligible Bidders for providing European Train Control System (ETCS) Level 2 signalling solution for Delhi-Meerut RRTS corridor.

Scope of Work

Package 24: Design, Supply, Installation, Testing & Commissioning of Signalling & Train Control and Telecommunication Systems for Delhi – Ghaziabad – Meerut RRTS Corridor of NCRTC.

Key Information

  • Tender No: DM/ST/COR-OF/100
  • Issue Date: 17th April 2020
  • Estimated Cost of Work: [Confidential]
  • Security Deposit (EMD): Rs 77 million
  • Bids Submission Last Date: 23rd June 2020 up to 1500 hrs.
  • Opening Date of Technical Bids: 24th June 2020 at 1700 hrs.

Tender documents can be downloaded from the official website of NCRTC or e-procurement portal from 17.04.2020 to 23.06.2020 up to 1500 hrs.

Pre-bid Meeting and Contact Point

The pre-bid meeting shall be conducted through video conferencing on 15.05.2020 at 11:00 hrs at the address below: National Capital Region Transport Corporation Ltd., Corporate Office Extension / GC office, Under CWG Flyover, Near CWG Village Flats, NH-24, New Delhi – 110092, India

Project Details

The Rs 30,274 crore DelhiMeerut RRTS is an 82.15 km long under-construction regional rail project connecting Delhi to Meerut via Ghaziabad. Recently, Bombardier Transportation emerged as the lowest bidder for supply 210 standard Rolling stock coaches to be operated in this corridor with a maximum speed of 160 km/h. National Capital Region Transport Corporation has decided to equip the line with ETCS Level 2 Signalling solution.

The design speed of the RRTS train will be 180 kmph while the operational speed will be 160 kmph. The LTE Backbone will cater to ETCS data, Mission Critical Voice and On-Board CCTV streaming. Telecom subsystems like CCTV, PIDS, PAS, FOTS, ACIDS, Master Clock, Telecom SCADA, Telephone, CDRS and Train to Ground Wireless Network are also part of the package.

The implementation will be interoperable with the other two corridors (Delhi – Panipat and Delhi-Gurugram-SNB-Alwar). The distance between Delhi and Meerut will be covered in around 62 minutes. The project is expected to start operations by 2025. 





Also Read




Leave Your Comment!









Recent Comments!

No comments found...!