First Time Riding the MRT or LRT? Your Easy Guide to Train Travel in the Philippines
How the Salman Canal Could Impact Indian Logistics, if operational?
Govt of India approves Integrated Transport & Logistics Authority to drive Multimodal Planning
PCMC approves ₹85 Lakh for DPR of Maharashtra’s First e-RTS Pilot Corridor
Visakhapatnam partners with Moscow to build Technology-Driven Urban Transport System
Biofuels in Shipping: A Transitional Solution or Long-Term Strategy?
8 Reasons Why Trains Are Still One of the Best Ways to Travel
Interview with Champak Panda, MD-Rolling Stock & Components, Alstom India
Beyond the Tailpipe: The Case for African Electric Mass Transit
A Rejected Claim Is Not Always the End, What Car Owners Can Do Next?
Chennai, India (Urban Transport News): Chennai Metro Rail Limited (CMRL) has issued tender notice for supply and installation of electrical systems for Corridor 3 (from Sholinganallur to SIPCOT 2) and Corridor 5 (from CMBT to Sholinganallur) of Phase 2 of Chennai Metro Rail Project.
Design, manufacturing, supply, installation, testing, training and commissioning of RSS, ASS, SCADA, OHE & Switching Stations for Corridor 3 (Sholinganallur to SIPCOT 2) and Corridor 5 (From CMBT to Sholinganallur) of Chennai Metro Rail Project, Phase 2.
This contract package will be funded by Asian Development Bank (ADB).