Qatar approves Saudi Rail Link Agreement, Accelerating Gulf Railway Vision 2030
UP Govt plans to introduce Water Metro services in Ayodhya, Varanasi & Prayagraj
India’s First Urban Ropeway begins Trial Run in Varanasi, Set to carry 1 Lakh passengers daily
India and Bhutan to Build First-Ever Rail Link: ₹4,033 Cr Project to Boost Regional Connectivity
Patna to launch Eco-Friendly Water Metro; Trial Run soon between Digha and Kangan Ghats
Air India Group set to launch Flights Operations from Navi Mumbai International Airport
Chennai to launch 25-Year Mobility Plan with Unified QR Ticketing and One-App Transit System
Kochi Metro bags ₹4.4 crore contract to prepare DPR for Mumbai Water Metro Proejct
Navi Mumbai International Airport set for September launch; IndiGo and Akasa Air to lead Operations
Noida International Airport to be Inaugurated on October 30, Commercial Flights in 45 Days
New Delhi, India (Urban Transport News): The National High Speed Rail Corporation Limited (NHSRCL) on 19th October 2020 issued the first tender notice for preparatory survey work to prepare the Detailed Project Report (DPR) for the proposed 459 km Delhi - Chandigarh - Amritsar High Speed Rail project.
Scope of work
The survey, Identification of Overhead, Over Ground, Underground Utilities And Identification Of Power Sourcing Options for substations along the proposed Delhi – Chandigarh – Amritsar High Speed Rail Corridor.
Key Information
Pre-bid Meeting and Contact Point
A pre-bid meeting is scheduled on 28.10.2020 at 11.00 hrs through video conferencing. Interested bidders may contact Executive Director/Electrical, National High Speed Rail Corporation Ltd., 2nd Floor, Asia Bhawan, Road No. 205, Sector-9, Dwarka, New Delhi-110077 for further details.
Project details
The proposed 459 km long Delhi – Chandigarh – Amritsar High Speed Rail Corridor will connect Delhi to Amritsar through 6 intermediate stations that are tentatively planned to be built at Delhi, Sonipat, Panipat, Ambala, Chandigarh, Ludhiana, Jalandhar and Amritsar. This corridor the fourth high-speed rail project proposed by the Government of India.
A consortium of RITES Limited and Systra MVA had completed the feasibility report of this project. According to the feasibility report of this submitted to the Ministry of Railways in 2017, the cost of the project was estimated to Rs 61,412 crore at a 2015 price level.
For more details, please explore the Delhi - Amritsar High Speed Rail page of Urban Transport News.