Qatar approves Saudi Rail Link Agreement, Accelerating Gulf Railway Vision 2030
UP Govt plans to introduce Water Metro services in Ayodhya, Varanasi & Prayagraj
India’s First Urban Ropeway begins Trial Run in Varanasi, Set to carry 1 Lakh passengers daily
India and Bhutan to Build First-Ever Rail Link: ₹4,033 Cr Project to Boost Regional Connectivity
Patna to launch Eco-Friendly Water Metro; Trial Run soon between Digha and Kangan Ghats
Air India Group set to launch Flights Operations from Navi Mumbai International Airport
Chennai to launch 25-Year Mobility Plan with Unified QR Ticketing and One-App Transit System
Kochi Metro bags ₹4.4 crore contract to prepare DPR for Mumbai Water Metro Proejct
Navi Mumbai International Airport set for September launch; IndiGo and Akasa Air to lead Operations
Noida International Airport to be Inaugurated on October 30, Commercial Flights in 45 Days
Chandigarh, India (Urban Transport News): The Haryana Rail Infrastructure Development Corporation Limited (HRIDC) on Monday online invited bids for the selection of General Consultant for 121.74 km proposed Haryana Orbital Rail Corridor (HORC) from Palwal to Sonipat via Sohna, Manesar and Kharkhoda in the State of Haryana.
The objective of the consulting services is to provide General Consultancy Services for the successful planning, basic & detailed designs, preparation of specifications, preparation of proposal documents and tender assistance, checking designs, project management and supervision including construction supervision, safety, quality and environmental management, interface management, testing and commissioning of the Haryana Orbital Rail Corridor (HORC). The planning shall include the O&M phase as well.
The Haryana Government has applied for financing Rs 5,566 crore from the Asian Infrastructure Investment Bank (AIIB) towards the cost of the Haryana Orbital Rail Corridor Project and intends to apply part of the proceeds for the consulting services. The project is being implemented by HRIDC which is established by the Ministry of Railways, and Govt. of Haryana. The consultant will be selected in accordance with the Quality-Cost Based Selection (QCBS) method set out in the Procurement Instructions for Recipients.
Expression of Interest (EOI) must be uploaded by the bidders online through the E-procurement portal of the Government of Haryana not later than 15:00 hrs on 17 August 2020.
The 121.74 km long Orbital Rail Corridor will have 17 stations including 14 new stations and three existing stations, 23 major waterway bridges, 195 minor waterway bridges, three rail flyovers, two road-over bridges, and 153 road-under bridge. The total cost of the project is estimated at Rs Rs 5,566 crore and the project completion deadline set to 2023.
For more details, please explore our Haryana Orbital Rail section.