Interview with Champak Panda, MD-Rolling Stock & Components, Alstom India
Beyond the Tailpipe: The Case for African Electric Mass Transit
A Rejected Claim Is Not Always the End, What Car Owners Can Do Next?
Monsoon Bike Insurance Guide: Covers That Matter before the Rains Begin
How Train Transportation Creates Faster and Smarter Cities
PM Modi inaugurates Noida International Airport, Boosting North India’s Multi-Modal connectivity
Things You Can Do While on Long Train Rides: Stay Productive, Relaxed, and Entertained
Rail Chamber launches 2026–27 National Membership Drive to strengthen Asia’s Railway Ecosystem
North-South Commuter Railway (NSCR): Modern Train Network Connecting Luzon Island
India launched Bharat Taxi Service as First Cooperative-Owned Digital Mobility Platform
New Delhi, India (Urban Transport News): The Delhi Metro Rail Corporation (DMRC) has opened technical bids for three civil contract packages of Delhi Metro Phase 4 this week. Here are the details of bidders as unveiled by DMRC:-
Architectural Finishing Works Including Design, Fabrication, Supply, Erection & Roof sheeting of Prefabricated Steel Roof Portal Pre- Engineered Building (PEB) Structures & Foot Over Bridge (FOB) including Design & Construction (Substructure & Superstructure) & necessary changes in the existing station for connection of FOB, External facade, Water Supply, Sanitary Installation, Drainage, Site development works at Seven Elevated Stations namely Keshopur, Paschim Vihar, Peeragarhi, Mangol Puri, West Enclave, Pushpanjali & Deepali Chowk on Janakpuri West to RK Ashram Corridor (Extn. of Line-8) of Phase 4 of Delhi Metro Rail Project.
The estimated value of this contract package is Rs 89.76 crores.
Architectural Finishing Works Including Design, Fabrication, Supply, Erection & Roof sheeting of Prefabricated Steel Roof Portal Pre- Engineered Building (PEB) Structures & Foot Over Bridge (FOB) including Design & Construction (Substructure & Superstructure) & necessary changes in the existing station for connection of FOB, External facade, Water Supply, Sanitary Installation, Drainage, Site development works at Eight Elevated Stations namely Madhuban Chowk, Prashant Vihar, North Pitampura, Haiderpur Badli Mor (over existing Line-2 station), Bhalaswa, Majlis Park, Azadpur & Ashok Vihar on Janakpuri West to R.K.Ashram Corridor (Extn. of Line-8) of Phase-4 of Delhi Metro Rail Project.
The estimated value of this contract package is Rs 93.86 crores.
Architectural Finishing Works Including Design, Fabrication, Supply, Erection & Roof sheeting of Prefabricated Steel Roof Portal Pre- Engineered Building (PEB) Structures & Foot Over Bridge (FOB) including Design & Construction (Substructure & Superstructure) & necessary changes in the existing station for connection of FOB, External facade, Water Supply, Sanitary Installation, Drainage, Site development works at Seven Elevated Stations namely Keshopur, Paschim Vihar, Peeragarhi, Mangol Puri, West Enclave, Pushpanjali & Deepali Chowk on Janakpuri West to RK Ashram Corridor (Extn. of Line-8) of Phase-4 of Delhi Metro Rail Project.
The estimated value of this contract package is Rs 86.23 crores.
Now the bids have been sent for technical evaluation by the tender committee.
For more details, please explore the "Delhi Metro" page of Urban Transport News.