PM Modi inaugurates Noida International Airport, Boosting North India’s Multi-Modal connectivity
Things You Can Do While on Long Train Rides: Stay Productive, Relaxed, and Entertained
Rail Chamber launches 2026–27 National Membership Drive to strengthen Asia’s Railway Ecosystem
North-South Commuter Railway (NSCR): Modern Train Network Connecting Luzon Island
India launched Bharat Taxi Service as First Cooperative-Owned Digital Mobility Platform
India places World’s First Live Commercial Order for Hyperloop-Based Cargo Logistics
How Weigh-in-Motion Systems Are Revolutionizing Freight Safety
Women Powering India’s Electric Mobility Revolution
Rail Chamber Launched to Strengthen India’s Global Railway Leadership
Wage and Hour Enforcement Under the Massachusetts Wage Act and Connecticut Labor Standards
New Delhi, India (Urban Transport News): The National Capital Region Transport Corporation Limited (NCRTC) on 18th September 2020 opened the financial bids of civil contract package 9A which was floated for the construction of a multi-stories residential complex for the RRTS project officials.
As per the financial bid result announced by NCRTC, SAM India Builtwell Private Limited has been emerged as the lowest bidder (L1) among the other six contenders. The financial position of all participants/bidders are as under:
The tender (DM/CN/COR-OF/111) was notified in April and the technical bids were opened in July 2020. The estimated value of this contract was Rs 293.14 Crores.
The scope of work includes the Construction of Multistoried Staff Quarters and connectivity from Mathura Road to Jangpura Stabling Yard Complex for Delhi – Ghaziabad – Meerut RRTS Corridor.
As per the tender notice, the work is expected to be completed in 30 months.