 Qatar approves Saudi Rail Link Agreement, Accelerating Gulf Railway Vision 2030
Qatar approves Saudi Rail Link Agreement, Accelerating Gulf Railway Vision 2030 UP Govt plans to introduce Water Metro services in Ayodhya, Varanasi & Prayagraj
UP Govt plans to introduce Water Metro services in Ayodhya, Varanasi & Prayagraj India’s First Urban Ropeway begins Trial Run in Varanasi, Set to carry 1 Lakh passengers daily
India’s First Urban Ropeway begins Trial Run in Varanasi, Set to carry 1 Lakh passengers daily India and Bhutan to Build First-Ever Rail Link: ₹4,033 Cr Project to Boost Regional Connectivity
India and Bhutan to Build First-Ever Rail Link: ₹4,033 Cr Project to Boost Regional Connectivity Patna to launch Eco-Friendly Water Metro; Trial Run soon between Digha and Kangan Ghats
Patna to launch Eco-Friendly Water Metro; Trial Run soon between Digha and Kangan Ghats Air India Group set to launch Flights Operations from Navi Mumbai International Airport
Air India Group set to launch Flights Operations from Navi Mumbai International Airport Chennai to launch 25-Year Mobility Plan with Unified QR Ticketing and One-App Transit System
Chennai to launch 25-Year Mobility Plan with Unified QR Ticketing and One-App Transit System Kochi Metro bags ₹4.4 crore contract to prepare DPR for Mumbai Water Metro Proejct
Kochi Metro bags ₹4.4 crore contract to prepare DPR for Mumbai Water Metro Proejct Navi Mumbai International Airport set for September launch; IndiGo and Akasa Air to lead Operations
Navi Mumbai International Airport set for September launch; IndiGo and Akasa Air to lead Operations Noida International Airport to be Inaugurated on October 30, Commercial Flights in 45 Days
Noida International Airport to be Inaugurated on October 30, Commercial Flights in 45 Days
                                     
                                    
                                
Hyderabad (Urban Transport News): Hyderabad Airport Metro Limited (HAML) having its principal offices at Metro Rail Bhavan, Rasoolpura, Begumpet, Hyderabad – 500 003 is engaged in the development of Mass Rapid transit System (MRTS) in the city of Hyderabad and as part of this endeavor, the Authority intends to prepare a Detailed Project Report (DPR) for development of an Elevated Bus Rapid Transit System (EBRTS) from KPHB to Financial District, Hyderabad. In pursuance of the above, the HAML has decided to carry out the process for selection of a Consultant for preparing the Detailed Project Report (DPR) and bid documents for the project.
The consultant shall prepare the DPR in accordance with Terms of Reference specified at Schedule - 1 (the "TOR"). The HAML invites proposals (the "Proposals") for selection of a Consultant who shall prepare DPR for development of an Elevated Bus Rapid Transit System (EBRTS) from KPHB to Financial District, Hyderabad. The HAML intends to select the Consultant through a competitive bidding in accordance with the procedure set out.
The corridor mostly runs along the KPHB Metro Station – KPHB Hitec City Road – Malaysian Township junction – Hitec City MMTS Station – Hitex – Hitec City Phase-II – Mindspace – IIIT – Financial District Road - Financial District.
The preferred alignment is proposed to be well integrated with major public transport systems as follows:
1. KPHB Metro Station, HMRL Metro Line-1 (Existing).
2. Hitec City MMTS Railway Station (Existing).
3. Mindspace Metro Station, HMRL (Corridor-3 Upcoming)
4. Hyderabad Airport Metro Rail Link at Raidurg (Proposed).
5. Hyderabad Metro (Phase-2) at its junction with Gachibowli – Miyapur Road (Proposed)
The proposed corridor will be fully elevated of 17 kms long with stations located at a spacing of around 500 to 600 meters for easy accessibility. It shall have depots in at-grade position both at terminals and one in between for operational convenience and non-fare revenue generation. RFP Notice No. 2241/HAML/SE(C)/EE-I/EBRTS Corridor/2019
RFP document can be downloaded from the Official Website of the HAML, http://hmrl.co.in. The Applicant shall submit a bid processing fee of Rs. 25000/- (Rupees Twenty Five thousand only) in the form of a demand draft or banker’s cheque drawn in favour of Hyderabad Airport Metro Limited payable at Hyderabad along with the technical bid document.
The following schedule shall be adhered for the selection process of the consultant :
The HAML has adopted a single stage two cover system selection process (collectively the "Selection Process") in evaluating the Proposals comprising technical and financial bids to be submitted in sealed envelopes separately on Proposal Due Date.
Prospective applicants may visit the Site and review the available data at any time prior to PDD. For this purpose, they will provide at least two days’ notice to the nodal officer specified below: Mr. NVA Prasad, Executive Engineer, Hyderabad Airport Metro Limited
All communications including the submission of Proposal should be addressed to: Mr. M. Vishnu Vardhan Reddy, Superintending Engineer (Coordination), Hyderabad Airport Metro Limited, Rasoolpura, Begumpet, Hyderabad – 500003 Telangana
Please fill up the following information and download the complete RfP notification shared by the Hyderabad Airport Metro Limited. [sociallocker id="2991"] Download the complete RfP Notification [/sociallocker] For more details, please write to editor@urbantransportnews.com