Qatar approves Saudi Rail Link Agreement, Accelerating Gulf Railway Vision 2030
UP Govt plans to introduce Water Metro services in Ayodhya, Varanasi & Prayagraj
India’s First Urban Ropeway begins Trial Run in Varanasi, Set to carry 1 Lakh passengers daily
India and Bhutan to Build First-Ever Rail Link: ₹4,033 Cr Project to Boost Regional Connectivity
Patna to launch Eco-Friendly Water Metro; Trial Run soon between Digha and Kangan Ghats
Air India Group set to launch Flights Operations from Navi Mumbai International Airport
Chennai to launch 25-Year Mobility Plan with Unified QR Ticketing and One-App Transit System
Kochi Metro bags ₹4.4 crore contract to prepare DPR for Mumbai Water Metro Proejct
Navi Mumbai International Airport set for September launch; IndiGo and Akasa Air to lead Operations
Noida International Airport to be Inaugurated on October 30, Commercial Flights in 45 Days
Patna, India (Urban Transport News): Delhi Metro Rail Corporation (DMRC) on 21st September 2020 has issued the first tender notice for the construction of about 8-km long underground stretch of Corridor 2 of the Patna Metro Rail project (Phase 1).
[Package PC-03]: Design and Construction of Twin Tunnel by Shield TBM, Tunnel by Cut & Cover, Underground Ramp at Rajendra Nagar and 6 Underground metro stations viz. Rajendra Nagar, Moin Ul Haq Stadium, University, PMCH, Gandhi Maidan & Akashvani with Entry/Exits & Connecting subway including Architectural Finishing, Water Supply, Sanitary Installation and Drainage works on New ISBT to Patna Station of Corridor-2 of Phase-I of Patna Metro Rail Project.
Sr. General Manager/Contract, Delhi Metro Rail Corporation, 5th Floor, A-Wing, Metro Bhawan, Fire Brigade Lane, Barakhamba Road, New Delhi –110001.
The first contract package (PC-01) worth Rs 552.93 crore of the Patna Metro Rail Project is awarded to NCC Limited on 18th September 2020 and the second contract package (PC-02) worth Rs 143.35 crore is awarded to Quality Buildcon Pvt. Ltd.
This is the third contract package and the fourth contract package (PC-04) is already floated on 21st September 2020.
The 14.05 km long corridor 2 of Patna Metro will connect Patna Junction Railway Station and New ISBT through 12 stations.
For more details about the project, please explore the Patna Metro section of Urban Transport News.