Govt of India approves Integrated Transport & Logistics Authority to drive Multimodal Planning
PCMC approves ₹85 Lakh for DPR of Maharashtra’s First e-RTS Pilot Corridor
Visakhapatnam partners with Moscow to build Technology-Driven Urban Transport System
Biofuels in Shipping: A Transitional Solution or Long-Term Strategy?
8 Reasons Why Trains Are Still One of the Best Ways to Travel
Interview with Champak Panda, MD-Rolling Stock & Components, Alstom India
Beyond the Tailpipe: The Case for African Electric Mass Transit
A Rejected Claim Is Not Always the End, What Car Owners Can Do Next?
Monsoon Bike Insurance Guide: Covers That Matter before the Rains Begin
How Train Transportation Creates Faster and Smarter Cities
Chennai, India (Urban Transport News): Chennai Metro Rail Limited (CMRL) on November 26, 2021 launched a global tender notice for ten elevated Metro Station of Corridor 3 of Chennai Metro Rail Project, Phase 2.
Design and constrution of elevated viaduct approximate length 10 km including elevated ramp and ten elevated metro stations at at Nehru Nagar, Kandanchavadi, Perungudi, Thoraipakkam, Mettukuppam, PTC Colony, Okkiyampet, Karapakkam, Okkiiyam Thoraipakkam & Sholinganallur for Corridor 3 of Chennai Metro's Phase 2.
Tender document can be downloaded from Govt’s eprocurement portal after payment of Rs 40,000/-.
For more details, interested bidder may contact to Addl. General Manager (Contract Procurement), Chennai Metro Rail Limited, Room No.507,5th floor,Administrative Building, CMRL Depot, Poonamallee High Road, Koyambedu, Chennai - 600107, Tamilnadu.
The 45.81 km Corridor 3 of Chennai Metro will span from Madhavaram Milk Colony to Siruseri SIPCOT 2. The line will consist of 48 metro stations, out of which 29 are underground and rest 19 are elevated.