PM Modi inaugurates Noida International Airport, Boosting North India’s Multi-Modal connectivity
Things You Can Do While on Long Train Rides: Stay Productive, Relaxed, and Entertained
Rail Chamber launches 2026–27 National Membership Drive to strengthen Asia’s Railway Ecosystem
North-South Commuter Railway (NSCR): Modern Train Network Connecting Luzon Island
India launched Bharat Taxi Service as First Cooperative-Owned Digital Mobility Platform
India places World’s First Live Commercial Order for Hyperloop-Based Cargo Logistics
How Weigh-in-Motion Systems Are Revolutionizing Freight Safety
Women Powering India’s Electric Mobility Revolution
Rail Chamber Launched to Strengthen India’s Global Railway Leadership
Wage and Hour Enforcement Under the Massachusetts Wage Act and Connecticut Labor Standards
Mumbai (Urban Transport News): Bids invited from the eligible and experienced consultancy firms to carry out safety assessment services for train control and signalling system and platform screen gates (PSG) for Mumbai Metro Line 2A and 7 Project.
Independent Safety Assessment Services For Train Control and Signalling System and Platform Screen gates (PSG) for Mumbai Metro Line 2A and 7 Project.
Mumbai Metro Line 2A and 7 of the Mumbai Metro Rail Project has a total length of 34.6 km fully constructed on an elevated viaduct with 30 elevated stations and one depot at Charkop Line 2A. Stations include - Andheri East, Shankarwadi, JVLR Jn., Mahanand, Aarey, Pathanwadi, Pushpa Park, Bandongri, Mahindra & Mahindra, Magathane, Devipada, National Park, Ovaripada, Dahisar (East), Upper Dahisar, Kandarpada, Mandapeshwar, Eksar, Borivali (West), Shimpawali, Kandivali (West), Dahanukarwadi, Valnai, Malad (West), Lower Malad, Pahadi Goregoan, Goregoan (West), Oshiwara, Lower Oshiwara, and D.N .Nagar.