Bengaluru, India (Urban Transport News): The Bangalore Metro Rail Corporation Limited (BMRCL) on 12th September 2020 issued an e-tender notice for the appointment of Project Management Consultant (PMC) for the Airport Line Metro Corridor of Bangalore Metro Rail Project.
Selection of Limited Project Management Consultancy (Designated Engineer) for the Civil construction works of Metro Corridor from Central Silk Board Junction to Kempegowda International Airport of Bengaluru Metro Rail Project Phase 2A & 2B.
Appointment of the consultant will be on Quality and Cost Based Selection (QCBS). Work will be awarded to the consultant, who scores the highest points in Technical and Financial evaluation combined together.
Phase 2A & Phase 2B of the Bangalore Metro Rail Project is 57.36 km long from Central Silk Board (CSB) to Kempegowda International Airport (KIA) including Depot construction works at Baiyappanahalli and near Kempegowda International Airport. The Phase 2A and Phase 2B work is funded by ADB. Work for construction of loops, ramps for a flyover at Central Silk Board Junction, which is a part of Package 1 of Phase 2A, is not funded by ADB.
The Phase-2 of the Bangalore Metro Rail Project consists of Four Extensions to the existing lines and Two New Lines with a total length of 72.095 km and 61 stations (49 Elevated and 12 Underground) and is currently being executed.
The General Manager (Contracts), Office of the Bangalore Metro Rail Corporation Limited, Third Floor, BMTC Complex, KH Road, Shantinagar, Bangalore-560027, Karnataka, India.
For more details, please explore the Bangalore Metro section of Urban Transport News.